In the village of Vinsady completed the repair of kindergarten No4 for 275 places
In kindergarten No4 village of Windsades of the Podgorny district completed all construction work

In kindergarten No. 4 of the village of Windsades of the Podgorny District, all construction work has been completed. This was reported by the head of the municipality Nikolai Bondarenko.
The progress of the repair, together with the Minister of Education of the Stavropol Territory Maria Smagina and colleagues from the Department of Education, was personally checked - the facility is ready for opening.
Work was carried out on the regional project “Family Support” of the national project “Family” and the state program “Education Development”. This allowed to perform a full cycle - from interior decoration to equipment with modern equipment.
Now there is improvement: on the territory set arbors and small architectural forms, in groups collect furniture, restore order inside and outside. The final stage is laying paving slabs and asphalting.
The garden is designed for 275 children, 12 groups will be formed. Each block is decorated in its own color scheme - according to the seasons.



