In schools of Borisov district eliminated violations after the intervention of the regional KGC
Thanks to the intervention of the department, classes and sports facilities in district schools were overhauled, the staff of the rural hospital was staffed and the work of the local boiler house was established.

According to the results of the inspection of the State Control Committee of the Minsk region, a number of violations were eliminated in the Borisov district, and social facilities were put in order. This was reported to the department.
As part of the response to citizens’ appeals, large-scale improvement works were carried out: the slopes of the building and the facade of the entrance group were updated in Zabashevichi secondary school, modern labor training rooms were equipped; the ceiling of the assembly hall was repaired in Gantsevichi secondary school and the floor covering in the corridors was replaced; the floor in the gym was repaired in the Moiseevshchinskaya secondary school and the furniture in the dining room was completely updated.
In addition to the educational sphere, the attention of the controllers touched on medicine and utilities. In the outpatient clinic of the Loshnitsky district hospital, a personnel shortage was solved - the staff was replenished with a surgeon and a general practitioner. In addition, uninterrupted hot water supply was restored in the village of Novosady: a hot water boiler was repaired in the local boiler room, which ensured a stable supply of heat to local residents and social institutions.
Photo: BELTA



