In the Soviet district of Voronezh eliminate a breakthrough in water supply
Due to emergency work, the water supply is temporarily stopped

In the Soviet district of Voronezh there was a communal accident. Specialists of RVC-Voronezh are working to eliminate a breakthrough on a pipeline with a diameter of 150 millimeters. Damage was found at the address: Lyuba Shevtsova Street, 36a.
Due to emergency work, the water supply is temporarily stopped. In order to minimize inconvenience for citizens, it is decided to carry out repairs in daylight hours – when most residents are at work or studying.
Despite the fact that a large residential area remained without water supply, the situation remains under control and does not go beyond the regular one. Employees of the water utility are doing everything possible to restore the supply of the resource as soon as possible.
A reinforced repair team is involved at the facility. The masters have already started repairing the damage and are fully focused on the task. The company apologizes for the temporary inconvenience and thanks residents for their understanding.



