Dozens of houses in the Primorsky district were left without heat due to repairs at the School
Residents of 28 houses in block 7 of Primorsky district on October 24 were completely without heat. Along with them, St. Petersburg residents in four more houses lost hot water. The reason was the reconstruction of heat networks on School Street, told “MK in St. Petersburg” in the press service of JSC “Heat Grid of St. Petersburg”.

Residents of 28 houses in block 7 of Primorsky district on October 24 were completely without heat. Along with them, St. Petersburg residents in four more houses lost hot water. The reason was the reconstruction of heat networks on School Street, told “MK in St. Petersburg” in the press service of JSC “Heat Grid of St. Petersburg”.
Work on the site began at nine in the morning on October 24. Due to the complexity of the reconstruction, the time of their implementation was extended - the heat power engineers promise to finish by 18:00 on October 25. After that, utilities will be informed about the need to return heating and HVS.
The press service of JSC Heat Grid of St. Petersburg noted that several reconstructions are underway in the area at once. Due to switching within them, heat in nearby homes can be limited. Therefore, there were previous heat blackouts in quarter 7 and other parts of the Primorsky district.
On Vasilievsky Island in St. Petersburg, the repair of heating networks was delayed earlier. After repairing one of the damage, specialists discovered a new malfunction, which left the heat supply to 75 residential buildings suspended.



