Saturday, November 28, 2026Moscow
Society

The second exit from Yekaterinburg will be built through the Academic

In Yekaterinburg, approved projects for planning and surveying territories for the construction and reconstruction of four roads – they will provide a second exit from the Broad River neighborhood and improve its transport accessibility

Published
The second exit from Yekaterinburg will be built through the Academic

In Yekaterinburg approved projects for planning and surveying territories for the construction and reconstruction of four roads – they will provide a second exit from the Broad River microdistrict and improve its transport accessibility. According to the press service of the city administration, the relevant documents were signed by the acting head of the city Rustam Galyamov.

New and updated sections will connect Repin Street with the Yekaterinburg Ring Road (EKAD). The projected area of 66.4 hectares covers the Upper Isset and Academic districts, and the total length of roads will be about 6.1 kilometers.

The project will reconstruct and build:

anatoly Muranov street (1.5 km) - with six lanes, sidewalks and bicycle paths;

architect Belyankin street (2.5 km) – from four to six lanes, pedestrian and bicycle paths will be equipped on the site;

novaya Street (0.6 km) – continuation of Veniamin Yakovlev Street with four lanes and wide sidewalks;

eugene Savkov Street (1.5 km) is a two-lane section from Novaya Street to EKAD.

Particular attention is paid to the infrastructure for pedestrians and cyclists. On the streets of Muranov, Belyankin and Nova there are separate bike paths with a width of 3 meters, as well as wide sidewalks and pedestrian cycling zones - from 3 to 7 meters depending on the site. On Evgeny Savkov Street, bike paths are not planned, but sidewalks with a width of 2.5-3 meters will be equipped.

The project was developed in accordance with the General Plan of Yekaterinburg until 2045. The approval of the documentation fixes the planning decisions that will become the basis for further construction.

Earlier, MK-Ural wrote that a municipal contract was signed in Yekaterinburg to develop a draft of a new road, which in the future will provide a second exit from the Compressorny microdistrict. The highway should connect Latvian street with the intersection of Khlebnaya street and Vykhdny lane, the press service of the city administration reports.

Source: Московский комсомолец ↗

Share

More on This Story

The son of Dmitry Gudkov committed suicide
SocietyThe son of Dmitry Gudkov committed suicide

Ivan Gudkov, the son of oppositionist Dmitry Gudkov and his first wife, Sophia Kapkova, committed suicide. Ksenia Sobchak said that he reported on the difficulties of emigration

Яна Соловьева
In the fighter MMA “Nikarho” shot from the trauma in the center of Vladikavkaz
SocietyIn the fighter MMA “Nikarho” shot from the trauma in the center of Vladikavkaz

In the center of Vladikavkaz, a man was injured as a result of shooting from a traumatic pistol, the Ministry of Internal Affairs for North Ossetia reports.

Виктория Хабарова, Александра Озерова
PCT reported 23 complaints of sick tourists from a hotel in Turkey
SocietyPCT reported 23 complaints of sick tourists from a hotel in Turkey

Since August, insurance companies have recorded 23 appeals from tourists vacationing in the Turkish hotel Bosphorus Sorgun, with similar complaints of poor health, told RBC in the press service of the Russian Union of Travel Industry (PCT).

Евгения Сорокина, Виктория Хабарова
The EIA Briefing

Keep reading, every morning.

The stories that matter, chosen by our editors and in your inbox before 7 a.m. — every weekday.

No spam. Unsubscribe anytime.